Piping

Raw pipes and fittings are moved directly to the shop floor, cut to the required sizes, fitted together and welded using automatic or manual processes. Heat treatment is performed with own equipment.

Radiographic examination, hydrotesting, valves bench testing can be performed at dedicated areas outside the main shop, preventing fabrication process from interruption and allowing to utilize shop floor area on a 24-hour basis.

Laser surveys are performed at every stage thus ensuring quick and accurate installation.

Unless otherwise requested by specifications pipe spools are fabricated to Pipe Fabrication Institute tolerances..