Plant
Monthly capacity
Assets
- 14 hectares area with 4 rail spurs
- 12,000 m2 of main fabrication shop fully equipped with modern processing machines (3D drilling, layout marking, plasma and gas cutting, sawing, punching, etc.)
- 2,800 m2 state-of-the-art surface preparation, painting and packing workshop with mobile drying cabins
- Hot-dip galvanizing plant with a 13 meters long zinc kettle
- 2 workshops for air-ducts fabrication (rectangular, round longitudinal seam and spiral)
- 6,900 m2 sheltered steel material storage area, 11,500 m2 open storage/assembly area and sensitive equipment indoor storage facilities with the controlled environment
- New shop dedicated for modules fabrication is under construction (1,290+3,400 m2)