Plant

Monthly capacity

 Assets

  • 14 hectares area with 4 rail spurs
  • 12,000 m2 of main fabrication shop fully equipped with modern processing machines (3D drilling, layout marking, plasma and gas cutting, sawing, punching, etc.)
  • 2,800 m2 surface preparation, painting and packing workshop
  • 5,500 m2 sheltered raw steel storage area and 18,000 m2 open storage/assembly area
  • Hot-dip galvanizing   plant with  13m x 1.5m x 2.5m zinc kettle
  • 2 workshops for air-ducts fabrication (rectangular, round longitudinal seam and spiral)
  • Concrete batching plant 60 m3/hour
  • Construction equipment and transport