Plant
Monthly capacity
Monthly capacity
- 7.4 ha – total area
- 12,000 m2 – main fabrication shop fully equipped with modern processing machines (3D drilling, layout marking, plasma and gas cutting, sawing, punching, etc.)
- 2,800 m2 – state-of-the-art surface preparation, painting and packing workshop with mobile drying cabins
- 550 m2 – air-ducts fabrication workshops
- 6,900 m2 – sheltered storage for steel materials (for up to 11,000 tonnes)
- 11,500 m2 – open storage/assembly area with gantry cranes
- Hot-dip galvanizing plant with a 13 meters long zinc kettle
- Rail spurs and access road, own power, gas, water supply lines