Plant

Monthly capacity

Monthly capacity

  • 7.4 ha – total area
  • 12,000 m2 – main fabrication shop fully equipped with modern processing machines (3D drilling, layout marking, plasma and gas cutting, sawing, punching, etc.)
  • 2,800 m2 – state-of-the-art surface preparation, painting and packing workshop with mobile drying cabins
  • 550 m2 – air-ducts fabrication workshops
  • 6,900 m2 – sheltered storage for steel materials (for up to 11,000 tonnes)
  • 11,500 m2 – open storage/assembly area with gantry cranes
  • Hot-dip galvanizing plant with a 13 meters long zinc kettle
  • Rail spurs and access road, own power, gas, water supply lines